Description:
|
Report on the viability of a single grants management system for executive agencies, including, if the results of the study determine an enterprise system is feasible: (1) an analysis of available technology options; (2) recommended changes to the state's organizational model, operational controls, and processes; (3) staffing and other resource needs; (4) high level system requirements; (5) estimated costs; and (6) an implementation road map.
|